Posted by Dana Breig Probert, EIT on March 26th, 2007

I am currently documenting some pipes information, and the little golden glifs that show up to mark a pending connection to a Structure or Pipe were driving me nuts.
They are very small by default. If you have a hard time seeing them on your screen you can make them bigger. I know this isn't the most groundbreaking tip I've ever posted but it took me a few minutes to find it, so I figured I'd share.
Â
Content is restricted to site members. Site membership is free, register below.
If you are an existing user, please login.
This entry was posted on Monday, March 26th, 2007 at 2:08 pm and is filed under 2007, General.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.